Permian Basin CTB-Facility Design Program

The client required a multi-facility program to design and construct a series of centralized tank batteries (CTBs) to serve multiple well pads while maintaining consistency, efficiency, and regulatory compliance.
Electrical System Studies

The client reached out to Halker to perform electrical studies on both existing and new-built assets. Through the studies, Halker would be able to advise the client on proper sizing of service, feeder, and branch circuits while maintaining adequate protective device coordination to decrease the risk of Arc Flash injuries. The goal was to make the client compliant per NEC regulations as well as the NFPA-70E standards for arc flash safety.
Full-Field Development

Process Engineering, Project Engineering, Equipment Design, Civil/Structural Design, Electrical Design, Instrumentation Design