Mechanical Engineering Projects

OOOOc Compliance Walkdowns
The client required a comprehensive assessment of over 80 production facilities to evaluate compliance with proposed EPA 40 CFR 60

Multi-Site Midstream Tie In Project
The client required a comprehensive engineering and design solution for a complex, multi-site pipeline tie-in project involving several interconnected valve

Midstream Plant Operational Efficiency Upgrades
The client required critical piping and equipment modifications to improve operational efficiency and system reliability within an existing process unit.

Meter Skid Tie In Project
The client required a detailed engineering and design solution to integrate multiple new meter skids—a main meter skid, a buy-back

Helium Plant Process Study
A client required a detailed process engineering study to evaluate the technical and economic feasibility of developing a new helium

Permian Basin CTB-Facility Design Program
The client required a multi-facility program to design and construct a series of centralized tank batteries (CTBs) to serve multiple

Bakken Basin CTB Facility Design Program
The client required an Owner’s Engineer to support the design and implementation of new centralized tank battery (CTB) facilities in

CTB-Facility Design Program
The client required detailed engineering and design for multiple centralized tank battery (CTB) and well pad facilities in New Mexico.

SWD Engineering and Design
The client required a comprehensive engineering and design solution for a new saltwater disposal (SWD) facility that aligned with established

SWD Commissioning and Construction Support
The client required comprehensive commissioning and startup support for a newly constructed saltwater disposal (SWD) facility. The project assumed mechanical

Permian Basin OOOOb Compliance Walk Downs
The client required accurate and verifiable greenhouse gas (GHG) emissions data for existing facilities across the Permian Basin. Many sites

Midstream Plant Expansion
The client required comprehensive engineering and design support to execute a series of upgrades at an existing natural gas processing

Helium Plant Engineering & Design
The client required a full engineering and design solution for a new helium processing facility capable of handling complex gas

Anadarko Basin OOOOb Compliance Walk Downs
The client required accurate and verifiable greenhouse gas (GHG) emissions data for existing facilities across the Permian Basin. Many sites

10,000-20,000 BBLPD SWD Engineering and Design
The client required a fully integrated engineering and design solution for a new 10,000 BBLPD saltwater disposal (SWD) facility, with

Greenfield Compressor Station Engineering and Design
The client required full engineering, design, and project management support for the development of a new greenfield gas gathering compressor

Bulk Test Conversion for Sour Service CTB Facility
The client required the conversion of existing Central Tank Battery (CTB) facilities into a large-scale sour service production site capable

Salt Water Disposal Facility & Infrastructure
Halker was tasked with coordinating the design of the Water Gathering Infrastructure with the contractors responsible for the Oil &

Sour Gas CTB-Facility Design
The client required a new centralized tank battery (CTB) in the Permian Basin capable of safely handling production from multiple

Mercury Removal & Bonus Target
In 2020, a Midstream distribution company (“Client”), with nearly 10,000 miles of pipelines and over 50 terminals for refined petroleum

Flare Study Project
As federal regulations continue to change and become more stringent, Oil and Gas companies must conform to these guidelines in

Flare System Retrofit
In 2015, a publicly traded pipeline transport company (“Client”), approached Halker Consulting (“Halker”) to evaluate a recently acquired gas plant.

Coal Additive System
The client had developed a process to reduce emissions at a coal power plant in Arizona, but needed assistance with

Gas Compressor Station
As with many Halker customers, this Texas based organization was challenged with a lack of internal engineering resources to match

Multi-Well Site Facilities
The paradigm of American energy is undergoing a massive transformation. In addition to the evolution of renewable energy technologies, and