Utilities Projects

High Voltage Support of Solar Interconnects
As renewable generation continues to expand across Colorado and the greater U.S. power grid, utility owners and developers face complex

City-Operated General Electric DER Adoption
A city-operated utility launched a Smart Grid Test Bed pilot program across three metropolitan areas to better understand how Distributed

138kV to 25kV 50MVA Substation
To serve as the Owner’s Advisor on behalf of our client for a new substation project. This new substation would

Power Distribution Sectionalizing Fuses
Halker’s client reached out to Halker to size sectionalizing fuses for their power distribution feeder taps to provide more sectionalizing

Power Infrastructure Feasibility Study
his client approached Halker to perform a feasibility study and preliminary design for the required power infrastructure to supply around

Electrical System Studies
The client reached out to Halker to perform electrical studies on both existing and new-built assets. Through the studies, Halker