Multi-Site Midstream Tie In Project

The client required a comprehensive engineering and design solution for a complex, multi-site pipeline tie-in project involving several interconnected valve and meter sites. The project demanded precise coordination across multiple facilities, including integration of new and existing pipeline segments of varying diameters, materials, and configurations.
Permian Basin OOOOb Compliance Walk Downs

The client required accurate and verifiable greenhouse gas (GHG) emissions data for existing facilities across the Permian Basin. Many sites contained incomplete or outdated equipment records within their asset management system, making it essential to validate and update information for all Tier 1 equipment.
Greenfield Compressor Station Engineering and Design

The client required full engineering, design, and project management support for the development of a new greenfield gas gathering compressor station in Utah. The facility needed to accommodate immediate production demands while maintaining flexibility for future expansion from two to four compressor units.