OOOOc Compliance Walkdowns

The client required a comprehensive assessment of over 80 production facilities to evaluate compliance with proposed EPA 40 CFR 60 Subpart OOOOc methane emissions standards. The project demanded rapid field data collection and engineering analysis to identify necessary equipment modifications, potential retrofit needs, and associated implementation costs.
Helium Plant Process Study

A client required a detailed process engineering study to evaluate the technical and economic feasibility of developing a new helium recovery facility. The project involved determining the optimal method for extracting marketable helium from a complex produced gas stream containing acid gases and other contaminants.
Permian Basin CTB-Facility Design Program

The client required a multi-facility program to design and construct a series of centralized tank batteries (CTBs) to serve multiple well pads while maintaining consistency, efficiency, and regulatory compliance.
Bakken Basin CTB Facility Design Program

The client required an Owner’s Engineer to support the design and implementation of new centralized tank battery (CTB) facilities in compliance with evolving federal regulations, including 40 CFR 60 Subparts OOOOa and OOOOb. The program involved simultaneous upgrades across more than 150 sites, demanding a coordinated, multi-discipline engineering approach that balanced regulatory compliance, constructability, and operational efficiency.
CTB-Facility Design Program

The client required detailed engineering and design for multiple centralized tank battery (CTB) and well pad facilities in New Mexico. Each site needed to balance standardization with customization—leveraging proven designs while adapting to site-specific production, layout, and regulatory requirements.
SWD Engineering and Design

The client required a comprehensive engineering and design solution for a new saltwater disposal (SWD) facility that aligned with established program standards and specifications. The project needed to maintain consistency with the client’s existing design framework while integrating updated electrical, instrumentation, and control (EI&C) standards.
SWD Commissioning and Construction Support

The client required comprehensive commissioning and startup support for a newly constructed saltwater disposal (SWD) facility. The project assumed mechanical completion by the construction contractor, but successful commissioning depended on coordinated system verification, safety assurance, and readiness documentation across multiple disciplines.
Permian Basin OOOOb Compliance Walk Downs

The client required accurate and verifiable greenhouse gas (GHG) emissions data for existing facilities across the Permian Basin. Many sites contained incomplete or outdated equipment records within their asset management system, making it essential to validate and update information for all Tier 1 equipment.
Helium Plant Engineering & Design

The client required a full engineering and design solution for a new helium processing facility capable of handling complex gas treatment and extraction operations. The project demanded seamless coordination among multiple engineering disciplines and the successful integration of a third-party proprietary helium extraction system into the overall process.
Engineering Site Assessments

The client required detailed engineering assessments for twenty well pad facilities in the Permian Basin to verify compliance with federal emissions regulations, specifically 40 CFR 60 Subpart OOOOb. The primary challenge was to ensure that all process equipment and vapor control systems were properly designed, configured, and operated to capture and control emissions effectively.