Engineering Site Assessments

The client required detailed engineering assessments for twenty well pad facilities in the Permian Basin to verify compliance with federal emissions regulations, specifically 40 CFR 60 Subpart OOOOb. The primary challenge was to ensure that all process equipment and vapor control systems were properly designed, configured, and operated to capture and control emissions effectively.
Anadarko Basin OOOOb Compliance Walk Downs

The client required accurate and verifiable greenhouse gas (GHG) emissions data for existing facilities across the Permian Basin. Many sites contained incomplete or outdated equipment records within their asset management system, making it essential to validate and update information for all Tier 1 equipment.
Power Distribution Field Inspection & Evaluation

This client reached out to Halker because they were having power reliability problems with their current utility interconnection and power supplier. They wanted to see if generation and/or a substation interconnection instead of a metered distribution point of interconnection would provide a better power source.