Gas Compressor Station

As with many Halker customers, this Texas based organization was challenged with a lack of internal engineering resources to match their exploration and collection volumes and timeframe.
Three Phase Separator

This experienced customer came to Halker Consulting with a need to design and engineer a three phase separator for multiple wellheads in the Rocky Mountain region. The specific needs around this project were based on the need to use a centralized processing facility rather than process at the well site.
Facilities Conversion to Meet Evolving Needs

Maybe they were not producing enough oil and gas previously to justify the infrastructure investment, or maybe the wells in the area were located too far away from established processing facilities to make sense for operators.
Strategic Field Development

The widespread adoption of offshore-born approaches by surface well operators in the last several years has been game changing for the U.S. oil and gas industry.
Central Processing Facilities

As the American oil and gas industry moves away from single-well, vertical drilling techniques and embraces the opportunities available via directional drilling and multi-well sites, many energy firms are facing new challenges when it comes to processing the increased production loads that come with these expanded systems.
Multi-Well Site Facilities

The paradigm of American energy is undergoing a massive transformation. In addition to the evolution of renewable energy technologies, and the changes being driven by the consideration of climate issues, the oil and gas opportunities evolving within the United States could be the key factor in the country’s successful energy independence.