Midstream Plant Operational Efficiency Upgrades

Midstream natural gas processing equipment with insulated piping, filter vessels, and structural supports in an outdoor facility, showcasing Halker’s operational efficiency upgrades focused on optimizing throughput, reducing bottlenecks, and improving reliability in midstream plant operations.

The client required critical piping and equipment modifications to improve operational efficiency and system reliability within an existing process unit. The project needed to address issues related to a pocketed bypass line and inefficient drainage while maintaining compliance with the client’s design and safety standards.

CTB-Facility Design Program

3D engineering model of an oil and gas processing facility with tanks, vertical process vessels, pump skids, and multicolored piping, illustrating Halker’s comprehensive upstream facility design, equipment layout optimization, and multidisciplinary engineering capabilities.

The client required detailed engineering and design for multiple centralized tank battery (CTB) and well pad facilities in New Mexico. Each site needed to balance standardization with customization—leveraging proven designs while adapting to site-specific production, layout, and regulatory requirements.

Helium Plant Engineering & Design

Aerial view of a remote helium processing plant with modular equipment skids, separators, compressors, and process piping arranged on a cleared desert site, highlighting Halker’s expertise in helium plant engineering, facility design, and specialty gas processing infrastructure.

The client required a full engineering and design solution for a new helium processing facility capable of handling complex gas treatment and extraction operations. The project demanded seamless coordination among multiple engineering disciplines and the successful integration of a third-party proprietary helium extraction system into the overall process.