Electrical, Instrumentation & Control Projects

Multi-Site Midstream Tie In Project
The client required a comprehensive engineering and design solution for a complex, multi-site pipeline tie-in project involving several interconnected valve

Meter Skid Tie In Project
The client required a detailed engineering and design solution to integrate multiple new meter skids—a main meter skid, a buy-back

Permian Basin CTB-Facility Design Program
The client required a multi-facility program to design and construct a series of centralized tank batteries (CTBs) to serve multiple

Bakken Basin CTB Facility Design Program
The client required an Owner’s Engineer to support the design and implementation of new centralized tank battery (CTB) facilities in

CTB-Facility Design Program
The client required detailed engineering and design for multiple centralized tank battery (CTB) and well pad facilities in New Mexico.

SWD Engineering and Design
The client required a comprehensive engineering and design solution for a new saltwater disposal (SWD) facility that aligned with established

SWD Commissioning and Construction Support
The client required comprehensive commissioning and startup support for a newly constructed saltwater disposal (SWD) facility. The project assumed mechanical

Midstream Plant Expansion
The client required comprehensive engineering and design support to execute a series of upgrades at an existing natural gas processing

10,000-20,000 BBLPD SWD Engineering and Design
The client required a fully integrated engineering and design solution for a new 10,000 BBLPD saltwater disposal (SWD) facility, with

Greenfield Compressor Station Engineering and Design
The client required full engineering, design, and project management support for the development of a new greenfield gas gathering compressor

Bulk Test Conversion for Sour Service CTB Facility
The client required the conversion of existing Central Tank Battery (CTB) facilities into a large-scale sour service production site capable

Sour Gas CTB-Facility Design
The client required a new centralized tank battery (CTB) in the Permian Basin capable of safely handling production from multiple

Water Injection
A Halker Client was in need of water injection facilities that could meet the needs of their water flood at

Full-Field Development
Process Engineering, Project Engineering, Equipment Design, Civil/Structural Design, Electrical Design, Instrumentation Design

Three Phase Separator
This experienced customer came to Halker Consulting with a need to design and engineer a three phase separator for multiple