Sour Gas CTB-Facility Design

The client required a new centralized tank battery (CTB) in the Permian Basin capable of safely handling production from multiple wells with elevated hydrogen sulfide (H₂S) concentrations. The project demanded a design that would ensure compliance with all applicable NACE sour service standards while maintaining efficient operations and accommodating future development.
Water Injection

A Halker Client was in need of water injection facilities that could meet the needs of their water flood at a constant pressure over time to aid in the recovery of their oil.
Full-Field Development

Process Engineering, Project Engineering, Equipment Design, Civil/Structural Design, Electrical Design, Instrumentation Design
Three Phase Separator

This experienced customer came to Halker Consulting with a need to design and engineer a three phase separator for multiple wellheads in the Rocky Mountain region. The specific needs around this project were based on the need to use a centralized processing facility rather than process at the well site.