Semi Annual Landfill Monitoring

The client required ongoing environmental monitoring and reporting to maintain compliance with state regulations and the site’s long-term environmental management plan. Specifically, the client needed semi-annual evaluations of landfill cover integrity, landfill gas emissions, and groundwater quality to verify that the site remained stable and protective of human health and the environment.
CABI Monitoring

The client required environmental oversight and documentation for a redevelopment project involving significant soil disturbance at a former industrial site. The primary challenge was ensuring that all excavation and materials handling activities complied with applicable environmental and asbestos management regulations.
Remedial Design and Construction Management

Engineering, design and construction services associated with the removal of 5,600 yd3 of radiologically-contaminated concrete and asphalt cover and the subsequent characterization of surface soils, subsurface soils and groundwater on a 6 acre site.