Anadarko Basin OOOOb Compliance Walk Downs

Large vertical production tanks with interconnected piping and access platforms at an oil and gas facility, illustrating Halker’s field expertise in EPA OOOOb compliance walkdowns, emissions verification, and regulatory readiness for Anadarko Basin operations.

The client required accurate and verifiable greenhouse gas (GHG) emissions data for existing facilities across the Permian Basin. Many sites contained incomplete or outdated equipment records within their asset management system, making it essential to validate and update information for all Tier 1 equipment.

10,000-20,000 BBLPD SWD Engineering and Design

3D engineering model of a high-capacity 10,000–20,000 BBLPD saltwater disposal (SWD) facility featuring multiple storage tanks, piping networks, and process equipment, showcasing Halker’s expertise in produced water infrastructure design, system optimization, and large-scale midstream project engineering.

The client required a fully integrated engineering and design solution for a new 10,000 BBLPD saltwater disposal (SWD) facility, with future expansion capacity to 20,000 BBLPD. The project demanded coordination across multiple engineering disciplines—process, mechanical, structural, electrical, and instrumentation & controls—to ensure consistency, compliance, and scalability.

Bulk Test Conversion for Sour Service CTB Facility

3D process model showing vertical vessel conversions with integrated piping and instrumentation, demonstrating Halker’s engineering expertise in bulk test modifications for sour service CTB facilities and compliance-driven upgrades to handle H₂S-rich production streams safely and efficiently.

The client required the conversion of existing Central Tank Battery (CTB) facilities into a large-scale sour service production site capable of safely managing high hydrogen sulfide (H₂S) concentrations. The project demanded a comprehensive redesign to accommodate new process equipment, integrate sour gas treatment systems, and ensure full compliance with applicable safety and regulatory standards.

Sour Gas CTB-Facility Design

Process flow diagram for a sour gas central tank battery (CTB) facility, illustrating separators, scrubbers, H₂S treatment, chemical injection systems, and flare routing, emphasizing Halker’s expertise in designing safe, compliant, and efficient sour-service production facilities.

The client required a new centralized tank battery (CTB) in the Permian Basin capable of safely handling production from multiple wells with elevated hydrogen sulfide (H₂S) concentrations. The project demanded a design that would ensure compliance with all applicable NACE sour service standards while maintaining efficient operations and accommodating future development.

Water Injection

Large industrial water injection tanks arranged on a graded site under an overcast sky, showcasing Halker’s engineering capabilities in designing and supporting high-capacity water management and injection infrastructure for oil and gas operations.

A Halker Client was in need of water injection facilities that could meet the needs of their water flood at a constant pressure over time to aid in the recovery of their oil.

Full-Field Development

Oilfield wellhead assembly with valves and piping in the foreground and a field technician conducting site evaluation in the background, highlighting Halker’s expertise in full-field development planning, production optimization, and comprehensive upstream facility engineering.

Process Engineering, Project Engineering, Equipment Design, Civil/Structural Design, Electrical Design, Instrumentation Design

Hydraulic Modeling Study

Digital hydraulic model with color-coded pipeline segments and contour lines illustrating pressure and flow behavior across a complex network, demonstrating Halker’s expertise in fluid dynamics analysis, pipeline optimization, and advanced hydraulic modeling for energy infrastructure.

The client requested hydraulic modeling and simulation of existing gas and water pipeline networks in order to assess wellhead pressures and provide recommendations on infrastructure additions and operational changes to mitigate bottlenecks in the pipeline network.

Flare Study Project

Engineers in hard hats observing an active flare stack at a midstream facility, emphasizing Halker’s expertise in flare system analysis, emissions management, and safety-focused flare study evaluations for oil and gas operations.

As federal regulations continue to change and become more stringent, Oil and Gas companies must conform to these guidelines in order to stay compliant.

Three Phase Separator

Horizontal three-phase separator with associated process piping, valves, and instrumentation, showcasing Halker’s oil, water, and gas separation engineering expertise and precision in designing efficient upstream production equipment.

This experienced customer came to Halker Consulting with a need to design and engineer a three phase separator for multiple wellheads in the Rocky Mountain region. The specific needs around this project were based on the need to use a centralized processing facility rather than process at the well site.